Success Story I Optimiser le processus de demande de changement technique
partage
Lire plus tard
Contact
Fabien Lasnaveres
Directeur Associé / Canada
Montréal
Optimize technical change request process
CHALLENGES
Before reaching serial maturity, railway vehicles are subject to a significant wave of technical modifications discovered during start of production, testing and validation phases.
In the context of tight planning, the challenge is “how to organize all these additional tasks and to secure on time and on quality deliveries? (under control configuration)”
SOLUTIONS
To optimize the change request process:
We improved the efficiency of the change process by streamlining it
Then, we ensured a quick implementation of the modification on production with a control on the applied configuration
Thus, we provided more visibility to all functions on the level of priority and criticality of each modification with a line of balance tool
Finally, we reinforced the role of each function in the change process
KEY DELIVERABLES
Implemented streamlined process
Implemented a new project governance
Criticality and prioritization tool implementation